city_hall

Sites oficiais usam .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

Um cadeado or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Beacon Hill Architectural Commission hearing

The commission will hold its monthly public hearing on Thursday, June 21, 2018.

(Use Congress Street as an entrance and exit after 5:30 p.m.)

O depoimento público começa às

Discussion Topics

  1. Design Review

    18.1089 BH  84 Chestnut Street (Continued from April 19, 2018 hearing)

    Applicant: Bryn Robinson, Boston Sign Company

    Proposed Work: Install projecting sign above storefront on Chestnut Street elevation.

     

    18.1238 BH  14 Beacon Street (Continued from May 17, 2018 hearing)

    Applicant: Megan O’Brien, FAROS Properties

    Proposed Work: Replace all hollow sheet metal windows on addition with 2/2 custom-made TDL wood windows with insulated glass panes.

     

    18.713 BH  34 Beacon Street (Continued from February 15, 2018 hearing)

    Applicant: Mona Bonnot

    Proposed Work: Install new intercom and camera system in wooden lintel to replace existing at front door in brass finish; replace door at side entrance without louver; install four security cameras at front, side and rear elevations.  (See Administrative Approval/Review item below).

     

    18.1415 BH  11 Chestnut Street

    Applicant: Joe Holland, M. Holland & Sons Construction, Inc.

    Proposed Work: Replace paired historic 6/6 window sashes at first floor with insulated glass sashes.

     

    18.1407 BH  87 Pinckney Street

    Applicant: Linda Ward

    Proposed Work: Replace existing pendant light at front entrance with recessed lighting; install 4”x4” brass speaker cover plate above existing door buzzers in wood surround at front entrance. (See Administrative Approval/Review item below).

     

    18.1389 BH  40 Beacon Street   WITHDRAWN

    Applicant: Guy Grassi, Grassi Design Group

    Proposed Work: Construct 4th floor addition at existing 3-story ell connecting previously approved addition to the existing 4-story carriage house.

  2. Administrative Review/Approval

    18.1296 BH 33 Beacon Street: Remove and repair front door in kind and repaint.

    18.713 BH   34 Beacon Street: Repair sections of front door and paint; replace sidelite panes at front entrance with insulated glass with putty and dimensions to match existing.

    18.1388 BH 36 Beacon Street: Replace missing window putty at four windows on front elevation, prep and paint sashes in kind; repair rotten wood at entry in kind; clean and repair wrought iron window grates to match existing; paint entry door black to match existing.

    18.1411 BH 40 Beacon Street, Unit 1: Repair three first floor windows with replacement restoration glass as necessary; replace secondary four-panel mahogany door in kind; reuse existing hardware; replace three non-original window sashes at basement level to match historic proportions and material. 

    18.1382 BH 51 Beacon Street: Lower non-original chimney on rear ell 10’-0” and remove metal bracket and cage.

    18.1408 BH 1 Charles River Square: Install black iron hand railings at front entrance to match 3 Charles River Square.

    18.1415 BH 11 Chestnut Street: Repoint sections of building with mortar to match existing; paint shutters, door, entry, balcony, garden fence, dormers, fascia and soffit in kind; replace slate roof in kind; clean downspout.

    18.1401 BH 15 Chestnut Street: Repair and repaint shutters on front elevation to match existing; repair masonry sills and headers in kind.

    18.1412 BH 40 Chestnut Street: Replace all eight pairs of shutters at front elevation; replace slate roofing in kind to match; repair copper fence at front roof; re-clad headhouse in copper in kind.

    18.1409 BH 59 Chestnut Street: Dismantle and reconstruct rear brick garden wall on Cedar Lane Way; replace lattice atop brick wall; repair exterior trim on front dormers; re-glaze all window sashes.

    18.1445 BH 46-48 Garden Street: Repair lintels and sills at doors and windows on front elevation; repair and repaint window trim in kind.

    18.1300 BH 74 Joy Street: Replace non-original paired French doors in kind off playground.

    18.1404 BH 4 Lime Street: Replace non-original shutters and tiebacks on front elevation.

    18.1354 BH 9 Lime Street: Replace three non-original 6/6 windows with “Proper Bostonian” windows to match existing.

    18.1312 BH 10 Louisburg Square: Repair and repaint all shutters on exterior.  

    18.1410 BH 82 Mount Vernon Street: Repair and repaint front doors, trim, handrails and shutters; expose copper on 2nd floor oriel by removing paint; replace all 12 double hung windows on front elevation due to severe rot and some replacements with TDL double hung, true wood 6/6 windows with insulated glass and half screens.

    18.1311 BH 85 Mount Vernon Street: Repair window sashes at front elevation and repaint in kind.

    18.1310 BH 63 Myrtle Street: Replace 14 non-original aluminum windows with double hung, 1/1 wood windows with insulated glass.

    18.1287 BH 82 Pinckney Street: Paint front door back to original color; repaint trim at entry; paint shutters in kind.

    18.1407 BH 87 Pinckney Street: Repair and repaint front iron balcony, door and trim in kind.

    18.1321 BH 66 Revere Street: Replace front door slab and paint in kind. 

    18.1317 BH 48 Temple Street: Replace composition roof shingles in kind; replace skylights in kind; install copper gutter. Approved as Emergency Repair.

    18.1403 BH 22 West Cedar Street: Paint front doors “Rembrandt Red”.

    18.1405 BH 29 West Cedar Street: Repaint front entry door and surround; clean and repoint front granite steps; repair brownstone lintels; repair and repaint dormers at mansard; replace all windows on front elevation in kind due to severe damage and rot; install new copper gutter and leader; repoint front façade to match existing mortar in material, color and tooling; repaint existing metal rail at 2nd story; deconstruct and rebuild leaning chimney using same bricks.

  3. REVIEW and RATIFICATION OF April 19, 2018 and May 17, 2018 MINUTES
  4. Staff Updates
  5. Adjourn
Voltar ao topo