city_hall

Sites oficiais usam .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

Um cadeado or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

St. Botolph Area Architectural Conservation District Commission hearing

The commission will hold its monthly public hearing on Wednesday, July 18, 2018.

(After 5:30 p.m. use Congress Street as an entrance and exit.)

O depoimento público começa às

Discussion Topics

  1. Design Review

    18.1517 SB 162 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1516 SB 164 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1515 SB 166 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1514 SB 172 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1513 SB 174 St. Botolph Street

    Applicant: Katherine Cipriani, GTI Properties

    Proposed Work: Replace handrail at front steps; repair and repaint holes in front steps.

     

    18.1212 SB  258 West Newton Street

    Applicant: Mark Van Brocklin, Embarc Studio

    Proposed Work: Remove chimney on rear elevation; construct roof deck; restoration of side chimney detailing; restoration of oriel at side elevation.

     

    18.1520 SB 27 Cumberland Street

    Applicant: Mark Van Brocklin, Embarc Studio

    Proposed Work: Replace all windows on front elevation with wood 1/1 double-hung windows; replace all windows on rear elevation with aluminum-clad windows; alter openings on rear elevation; replace garden fence and stoop rail; construct roof deck; construct cantilevered deck and staircase at 2nd story at rear yard; construct cedar fence at rear yard with rear gates; install pavers at rear yard.

  2. Administrative Review/Approval

    18.1534 SB     10-12 Cumberland Street: Repoint front mortar joints along roofline to match existing; reset existing slate roof; install ice dams on roof.

    18.1520 SB     27 Cumberland Street: Refinish and paint front doors and sidelights; repoint front and rear elevations to match existing; repair window sills and headers; repair cornice; repair curbing at front yard; replace existing gutters with copper gutter and downspout; repair fire balconies and paint;  (see Design Review items above).

    18.1531 SB     7 Durham Street: Repoint front façade with mortar to match existing.

  3. REVIEW and RATIFICATION OF June 20, 2018 PUBLIC HEARING MINUTES
  4. Staff Updates
  5. Adjourn
Voltar ao topo