city_hall

Bogagga rasmiga ah waxay adeegsadaan .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

Quful or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Back Bay Architectural Commission

The commission will hold its monthly public hearing on Wednesday, January 10, 2018, at 5 p.m.

(Use Congress Street as an entrance and exit after 5:30pm.)

Maragga dadweynaha wuxuu bilaabmaa

Mawduucyada doodda

  1. Design Review

    18.756 BB DAS Network Nodes - Multiple Locations: Replace eleven existing light poles with a replacement pole that includes DAS antenna and related telecommunications equipment at the following locations: Commonwealth Avenue & Exeter Street; Commonwealth Avenue & Arlington Street; Boylston Street & Dartmouth Street (2); Boylston Street & Berkeley Street; Boylston Street & Fairfield Street; Boylston Street & Exeter Street; Newbury Street & Exeter Street; Newbury Street & Hereford Street; Newbury Street & Berkeley Street; and Newbury Street & Arlington Street.

    18.760 BB 370 Commonwealth Avenue: Installation of a sidewalk café along Massachusetts Avenue.

    18.686 BB 123 Newbury Street: At front façade renovate entry and entry doors, repair and re-point masonry, re-construct cornice, and re-paint roof deck railing; and at front façade and rear elevation replace deteriorated wood windows.

    18.761 BB 175 Newbury Street: At front façade renovate first story and lower level storefronts.

    18.754 BB 225 Beacon Street: At roof replace air conditioning units, remove existing skylight and roof hatch, install flat skylight for roof access, and install roof deck.

    18.759 BB 260 Beacon Street: At front façade alter seventh-story fenestration pattern and replace window units; at rear elevation alter seventh-story fenestration pattern and replace door/window unit.

    18.771 BB 361 Beacon Street: Amend Application 18.262 BB to include constructing a copper clad penthouse addition, roof deck, and four rooftop condenser units.

    18.751 BB 315 Dartmouth Street: At Dartmouth Street façade repair and alter entry portico.

    18.744 BB 317 Marlborough Street: At roof construct roof deck and headhouse.

  2. Administrative Review/Approval

    18.743 BB 164 Beacon Street: At rear elevation replace four non-historic second-story one-over-one wood windows in-kind.

    18.738 BB 230 Beacon Street: At rear elevation replace non-historic wood door in-kind.

    18.740 BB 501 Boylston Street: At Boylston Street façade replace existing wall sign.

    18.755 BB 669 Boylston Street: Replace existing roof top equipment.

    18.753 BB 799 Boylston Street: At street level modify two exterior wall signs and replace three interior window signs.

    18.748 BB 42 Commonwealth Avenue: Repair roof and replace deteriorated metalwork and slate in-kind.

    18.742 BB 119 Commonwealth Avenue: At front façade replace deteriorated fourth-story one-over-one wood window in-kind.

    18.675 BB 167 Commonwealth Avenue: At front façade replace eight non-historic one-over-one wood windows in-kind; and at rear elevation replace two non-historic one-over-one wood windows in-kind.

    18.487 BB 18 Hereford Street: At front façade replace deteriorated sections of wood in-kind and re-paint to match existing color; re-paint metalwork black; patch and re-paint cement at entryway.

    18.752 BB 293 Marlborough Street: Replace rubber roof and roof deck in-kind.

    18.581 BB 350 Marlborough Street: At front façade install black iron handrails at entry stoop.

    18.717 BB 428 Marlborough Street: Replace rubber membrane roof in-kind

    18.741 BB 133 Newbury Street: At front facade install new wall sign and window awnings at first story retail space.

    18.765 BB 134 Newbury Street: At front façade replace wall sign at lower level retail space.

    18.749 BB 217 Newbury Street: At front façade replace wall sign at lower level retail space.

    18.758 BB 298 Newbury Street: At rear elevation install three louvers to vent interior mechanical equipment.

     

  3. Ratification of 12/13/2017 Public Hearing Minutes
  4. Staff Updates
  5. Projected Adjournment - 8:00pm
Ku noqo kor