city_hall

Trang web chính thức sử dụng .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

Ổ khóa or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Boston.gov Search

Get direct answers to your questions about City of Boston services. While we strive for accuracy, our search can occasionally provide unexpected results. You can help us improve by using the feedback buttons below each answer. Have questions? Contact us at digital@boston.gov.

Questions? Contact us at digital@boston.gov.

Choose a search type

Canceled:
Fort Point Channel Landmark District Commission

Reason for cancellation: lack of quorum
Công chúng có thể đưa ra lời chứng.

Discussion Topics

  1. DESIGN REVIEW

    APP # 25.0466 FPC               332 CONGRESS STREET 

    Applicant: Daniel Brennan 

    Proposed Work: Replace single entry door with (2) two 36” wide wood/glass doors; Replace two fixed windows with accordion style operable windows; Paint pilasters, portion of cornice, and entry doors; Install (3) three sconce light fixtures; Install blade sign at far left pilaster; Install individual letter signage affixed to an LED raceway Center on two windows; install vinyl window decals at entry door. Continued from the 12/12/24 Public Hearing.

     

     

    APP # 25.0521 FPC                                     259-267 SUMMER STREET 

    Applicant: Adam Burns

    Proposed Work: As part of the larger office-to-residential conversion project, the proposed scope of work includes selective updates to the southern façade, replacing one column of masonry window infills with historic windows spanning floors 1-8 and one column of louvers with Juliet balconies onfloors 2-8. The applicant will also remove the infill of three at-grade windows and replace them with historic windows. Additional work includes constructing a roof deck and extending the existing headhouse to provide secondary rooftop egress, both designed to remain non-visible from Summer and Melcher Streets. Lastly, rooftop mechanicals will be replaced with updated infrastructure, designed and confirmed to be non-visible from surrounding streets.

     

  2. RATIFICATION OF 12/12/24 PUBLIC HEARING MINUTES
  3. STAFF UPDATES
  4. PROJECTED ADJOURNMENT: 7:30 PM
Quay lại đầu trang