city_hall

Официальные сайты используют .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

Замок or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Beacon Hill Architectural Commission Hearing

The commission will hold its monthly public hearing on Thursday, January 19, 2017.

(Use Congress Street as an entrance and exit at City Hall after 5:30 p.m.)

Публика может выступать.

Темы обсуждения

  1. Review and Ratification of December 15, 2016 Minutes
  2. Administrative Review

    17.547 BH  68 Chestnut Street: Remove the cement and reset the select portion of the brick sidewalk.

    17.614 BH  107 Chestnut Street, Apt. 4: Install three one-over-one storm windows with a black finish at both the second and third floors on the secondary façade.

    17.732 BH  79 Pinckney Street: Reconstruct the rear brick wall fronting Grove Square, and reinstall and repair the existing wrought iron railing on top of the brick wall in-kind.

    17.716 BH  54 Temple Street, Apt. 3: Replace two arch-headed one-over-one, one arch-headed two-over-two, and one square-headed two-over-two, double-hung wood windows with a black painted finish in-kind at the second floor on the Temple Street façade.

  3. Staff Updates
Наверх